A par level is the quantity of an item you want on hand once a delivery has landed: the level you stock back up to. It works with a second, lower number, the reorder point, which is the level that tells you to place the order.
- Par level decides how much to order: par minus what you hold now.
- Reorder point decides when to order: when stock falls to it.
How to calculate both
reorder point = (average daily usage x lead time in days) + safety stock
par level = (average daily usage x days between deliveries) + safety stock
Butter, used at 2 kg a day, from a supplier who delivers five days after an order, with safety stock of half the lead-time demand (5 kg):
- Reorder point: 2 x 5 + 5 = 15 kg. When the shelf drops to 15 kg, order.
- Par, if you order once a week: 2 x 7 + 5 = 19 kg. When the order goes in at 15 kg, order 14 kg: you will use 10 kg before it arrives, so it lands on 5 kg and brings you back to 19 kg.
Start the safety stock at about half of lead-time demand, then adjust for how variable usage and delivery times are. A steady item from a reliable supplier needs less; an unpredictable one needs more.
What overrides the calculation
Shelf life caps par. If par is more than you can use before the item expires, order more often rather than more at once.
Supplier minimums can force it up. A minimum order quantity above what you need leaves you holding more than par, which is a shelf life question before it is a cash one.
Revisit both numbers seasonally. A par set in a quiet February starves a December.